The patented TREVCON-VEYOR offers you the most progressive and effective restoration system for stabilizing pilings and bulkhead weakened by erosion, sheet-pile deterioration, or dredging. The flexible barge unit uses a partially submerged conveyor system to place reinforcement stone directly at previously unreachable pile and bulkhead bases. Easily transportable via water or land, this extraordinary apparatus allows us to work without using dock space or interrupting ongoing dock operations.
The TREVCON-VEYOR offers the following unique capabilities:
Examples of successful applications included the bulkhead stabilizations for Port Newark and Port Elizabeth.