Marine & Underwater Construction Projects

Trevcon was contracted by Hunter Roberts Construction Group to install two precast pile supported travel lift piers, and monopiles for the berthing slips and maintenance slips for the ferries. This facility will provide a base for the Citywide Ferries, as well as serve as a maintenance facility for the vessels.
New pier and marina for the Fordham University Sailing Club.
Construct new pier to support a large gantry crane for services the historic graving dock adjacent to the pier.
Replace existing anchored sheet pile bulkhead.
Build two new marine railway bridges for the last remaining cross-harbor rail traffic by barge.
Remove existing relieving platform and install new marginal wharf with landscaped upland terrace structure.
Trevcon Construction was contracted by Global Container Terminals in Bayonne, NJ to construct the new 1,335-foot-long Berth 3. The terminal is one of the most advanced shipping container terminals on the East Coast. Berth 3 will receive four new shipping container cranes capable of unloading the largest shipping vessels in the world.
Construct a new 985 foot long pier to be used for recreational purposes.
Design-build project to install new fender systems, paint the towers and maintain the bridge cables.
Construction of a new pedestrian esplanade on the East River.
Underwater emergency stabilization of the east abutment bridge foundation.

Trevcon Construction
30 Church St., Liberty Corner, NJ 07938
Phone: 908-580-0200

Copyright © Trevcon Construction 2024
All Rights Reserved