Trevcon Featured in PDCA Magazine

Trevcon was featured in PDCA magazine for the Reconstruction of Piers 9 and 204 Phase II: Construction of Piers 9 and 204 for our ingenuity in the development and implementation of a unique timber pile extractor. The project contained approximately 2000 timber piles of lengths up to 100’ long that were in deteriorated conditions, had to be gripped 5’ below mudline and the butt of the pile was at MLW with water depths of 0-30feet. The challenges, scope, and schedule were overcome through strategic planning, engineering, and partnering with our equipment suppliers. The whole article and details can be viewed here:

http://lesterfiles.com/pubs/PDCA/digital/2019/issue-02/page_98.html